Monday, March 30, 2015

Arch Daily- FDNY Marine Co. No. 9- It Has Grass Growing On the Roof, too!




FDNY Marine Company 9 / Sage and Coombe Architects




© Paul Warchol

Architects: Sage and Coombe Architects, LLP
Location: Staten Island, NY, USA
Proyect Year: 2012
Project Area: 9,500 sqft
Photographs: Paul Warchol
   
Marine 9 celebrates the architectural tradition and iconography of historical  City firehouses. As a composition of 2 stacked and shifted volumes with contrasting materials and color, the building expresses the separation between public and private space. An expansive common hall running the length of the building — glazed floor-to-ceiling with fritted glass — reinforces the constant presence and watchful eye of the firefighters, while allowing the firefighters both privacy and the necessary surveillance of the shore. The boat, the Firefighter 2, is necessarily part of the composition; without the boat there would be no house and so the materials, colors and mass of the boat are reflected in the house.

© Paul Warchol

The stair hall and public entry are the expressions of the firehouse as a civic institution, recalling the old firehouse truck bay and stair, where plaques and banners are traditionally displayed. In the new firehouse, the stair hall opens to the private side of the building, looking out past the house-watch and to the new boat beyond.

© Paul Warchol

The barracks replaces a converted dog kennel that once housed the marine company at the Stapleton Waterfront. The new structure is built on the Navy’s Homeport pier and supports the FDNY’s new state-of-the-art Fire Boat, Firefighter 2.

© Paul Warchol
Occupying only a portion of the 1440 foot long cast-in-place concrete pier, the new “house” respects restrictive zoning and public access requirements that define the height and breadth of the building. The new firehouse is gender-neutral. Programmatically, the building includes all the parts of a modern firehouse: a machine shop, commercial kitchen, cardiovascular workout room, dorm and offices – except there is no truck.

© Paul Warchol

Marine 9 is intended to serve as a model for future sustainable practices in facility design and construction for the FDNY. Sustainable strategies include a green roof, a solar hot water system, passive solar heating, daylighting, passive shading and natural ventilation.

Elevation

* Location to be used only as a reference. It could indicate city/country but not exact address.
Cite:"FDNY Marine Company 9 / Sage and Coombe Architects" 27 Jun 2012. ArchDaily. Accessed 30 Mar 2015.


No comments:

Post a Comment

Please leave a comment-- or suggestions, particularly of topics and places you'd like to see covered